Warehouse-AGV project

IVC has placed an order with Egemin for an automated warehouse solution for its manufacturing facility in Dalton, Georgia. The order consists of an integrated warehousing system with AGVs to handle the intermediate transport flows of slabs and rolls and storage of slabs.

Egemin
Automation recently delivered an integrated warehouse system for
IVC’s Avelgem plant in Belgium. This system handles the transport
and storage for luxury vinyl floors from production to the new
warehouse and distribution hall.  
IVC
US’s order consists of an integrated warehousing and WIP transport
system supporting the production and logistic processes at the Dalton
plant.

Egemin will deliver two slab handling E’gvs
from the LTV series (Load Transfer Vehicle) and two side-lifting roll
handling E’gv
s
from the FLV series (Fork Lift Vehicle) to handle loads up to
 14,000
lbs (6.4t) and 19,400 lbs (8t) per load, respectively.

Published By

Western Business Media,
Dorset House, 64 High Street,
East Grinstead, RH19 3DE

01342 314 300
[email protected]

Contact us

Simon Duddy - Editor
01342 333 711
[email protected]

Liza Helps - Property Editor
07540 624 360
[email protected]

Louise Carter - Editorial Support
01342 333 735
[email protected]

Neill Wightman - Sales Manager
07818 574 304
[email protected]

Sharon Miller - Production
01342 333 741
[email protected]

Logistics Matters