Dock house option

Dock houses – complete pods consisting of a dock leveller and dock shelter in one – can be useful to maximise warehouse space providing an additional area between the warehouse and the vehicles being loaded and unloaded.

Situated on the outside of the warehouse walls, they allow the use of internal space to be maximised. It’s also possible to build dock houses that can be moved around, creating ‘portable’ loading docks which can greatly improve flexibility in the operation. In short, they can be invaluable additions to warehouses or distribution centres.

Stertil Dock Products, one of the UK’s leading suppliers of loading bay equipment, believes that dock houses are an underrated option that more logistics operations should consider. If properly designed, dock houses can be relatively light in structure while still being strong enough to cope with heavy loads.

Dock houses are generally manufactured from insulation panel with a minimum 40mm thickness (80mm is optional). They can, however, be covered in single-skin cladding for ambient buildings. Insulation panels are self-supporting and are extremely strong when fixed in position with deep ‘U’ channels. Roofs are usually made from a deep corrugated section, which is flashed and fitted with downpipes to take rain water down to the service yard level.

The dock shelter or dock pad fixing is organised within the structure and this is generally taken care of by galvanised folded sections fabricated into a frame. The door can be housed at the building line creating maximum insulation of the main warehouse when the door is closed. Alternatively, it can be housed within the dock house – either at the front or rear. However, it’s important to remember that, if a sectional door is to be used, the dock house must be sufficiently high and long to take the door tracks.

Installation needs to be carefully considered. At many sites, the dock houses are entirely separate and independent of each other because it suits the programme for pouring the floor slab inside the warehouse. By contrast, they can be installed in multiple units if space between them is limited.

Published By

Western Business Media,
Dorset House, 64 High Street,
East Grinstead, RH19 3DE

01342 314 300
[email protected]

Contact us

Simon Duddy - Editor
01342 333 711
[email protected]

Liza Helps - Property Editor
07540 624 360
[email protected]

Louise Carter - Editorial Support
01342 333 735
[email protected]

Neill Wightman - Sales Manager
07818 574 304
[email protected]

Sharon Miller - Production
01342 333 741
[email protected]

Logistics Matters