Meeting the demand

Posted on Wednesday 19 May 2021

With increased demand for UK warehouse space, a temporary modular building from Roder UK provides a fast, flexible, and cost-effective alternative to a traditional warehouse or canopy.

The last thing any growing business needs is a slowdown caused by lack of space in which to operate. And with warehousing at a premium, there has never been a better time to consider installing a semi-permanent building in your own yard. With the requirement for groundworks either minimal or non-existent, a lead time that could see your building installed within weeks, and construction methods that mean a modular building from Roder UK is not only greener but cheaper than the traditional alternative, if you need space, we build it. Whether you’re looking for a loading bay canopy, temporary warehouse, or fully equipped modular building, our tried and tested range of structures are engineered to last as long as you need them yet designed to be removed swiftly when you don’t.

Roder buildings have clear spans from 5m to 40m and eave heights running from 3.5m all the way to 8.2m, making them suitable for anything from simple loading bay coverage or secure, cost-effective storage to fully insulated, racked warehousing and production buildings, heavy plant and land reclamation operations, or high bay loading cover. Recent improvements to our manufacturing process are about to allow us to deliver to site in as little as two weeks from order, with installation in a matter of days, creating badly needed space much faster than any traditional construction project, whilst minimising disruption to your business. Removal is just as fast, making Roder buildings ideal for temporary or peak operational requirements, and giving you back the external space the building occupied with no need for expensive groundworks when demand settles.

Roder modular buildings aren’t just cheaper to buy and install, they’re inexpensive to run as well. With translucent roof material negating the need for banks of warehouse lights all burning during daylight hours and a fleece-lined thermal roof capable of reducing heat loss by up to 54% over a similar building, they represent not only a reduction in your carbon footprint but your energy bills as well. If your business needs to optimise space, whether temporarily, or just quickly and cost-effectively, talk to us about a Roder modular building.

01487 840 840  |  www.roder-industrial.co.uk  | [email protected]

Published By

Western Business Media,
Dorset House, 64 High Street,
East Grinstead, RH19 3DE

01342 314 300
[email protected]

Contact us

Simon Duddy - Editor
01342 333 711
[email protected]

Liza Helps - Property Editor
07540 624 360
[email protected]

Louise Carter - Editorial Support
01342 333 735
[email protected]

Neill Wightman - Sales Manager
07818 574 304
[email protected]

Sharon Miller - Production
01342 333 741
[email protected]

Logistics Matters