Baytree launches BREEAM Outstanding scheme in Leeds

Baytree Logistics Property has announced the launch of two of the first BREEAM Outstanding warehouses to be built speculatively in Leeds.

By Liza Helps Property Editor Logistics Matters

THE UNITS totalling 76,285 ft2 and 145,476 ft2 (Unit 1 and Unit 3) will make up Phase 1 of the Baytree Leeds scheme and will be delivered by Summer 2024.

Phase 2 is a 329,583 ft2 facility (Unit 2), which is available on a build to suit basis.

Baytree Leeds will be built net zero carbon and will target BREEAM Outstanding,  EPC A and WELL Ready standards. 

Unit 1 will have 12.5m eaves and have eight dock and two level access doors a 50kn/m2 floor loading 35m yard and benefit from PVs, Ev charging, and staff amenity areas on site. The larger Unit 2 will have 15 dock and 3 level access doors, 15m eaves and a 50m yard.

DTRE and JLL are joint agents.

Published By

Western Business Media,
Dorset House, 64 High Street,
East Grinstead, RH19 3DE

01342 314 300
[email protected]

Contact us

Simon Duddy - Editor
01342 333 711
[email protected]

Liza Helps - Property Editor
07540 624 360
[email protected]

Louise Carter - Editorial Support
01342 333 735
[email protected]

Neill Wightman - Sales Manager
07818 574 304
[email protected]

Sharon Miller - Production
01342 333 741
[email protected]

Logistics Matters