Large Nuneaton warehouse fitted out ahead of schedule
PD INDUSTRIAL completed the high-specification pallet racking installation at a major new logistics hub in Nuneaton.

At 1,000,000 sq ft, the fully fitted out development serves as one of the most ecologically advanced warehouse in the UK.
The fast-track project started at the end March and concluded at the beginning of June. The facility was developed by Baytree (AXA) and built by Glencar.
Operating under full CDM regulations as both principal designer and principal contractor, PD managed the end-to-end transformation of the space.
Deliverables included:
- 468 bays of advanced pallet racking.
- 13,500+ pallet positions: 11,112 pallets across 5,556 double-stacked locations, alongside 2,466 single-stacked pallet locations.
- Precision floor grinding to ensure perfect level tolerances for high-density operations.
- Wire guidance systems: Integrated wire guidance to support VNA truck navigation.
- Safety and labelling: Full installation of overhead sprinkler pipes integrated within the racking structure, completed by bespoke warehouse racking labelling for immediate inventory onboarding.
PD Industrial managing director Darren Hardiman said: “Delivering over 13,500 pallet positions in just nine weeks requires precision engineering and tight project management and is a significant undertaking. Working within a world-class, award-winning building allowed us to showcase our ability to deliver high-density, safe, and highly efficient warehouse environments ahead of schedule. With the handover complete, the facility is now fully optimised and operationally live.”



