Specially insulated temporary building
Jaguar Land Rover’s Solihull plant is the latest site to have a Spaciotempo temporary building installed. The 750m2 building is the second to be installed this year for the car manufacturer, after a 400m2 facility was installed at its Coventry plant, as part of an expansion programme.
The Solihull building is used to store vehicle panels in the pre-paint stage of production and has been specially insulated to ensure condensation is kept to the minimum.
The temporary building also features a high-speed shutter door that allows quick and easy access without letting the elements affect the parts.


