Specially insulated temporary building

Jaguar Land Rover’s Solihull plant is the latest site to have a Spaciotempo temporary building installed. The 750m2 building is the second to be installed this year for the car manufacturer, after a 400m2 facility was installed at its Coventry plant, as part of an expansion programme.

The Solihull building is used to store vehicle panels in the pre-paint stage of production and has been specially insulated to ensure condensation is kept to the minimum.

The temporary building also features a high-speed shutter door that allows quick and easy access without letting the elements affect the parts.

Published By

Western Business Media,
Dorset House, 64 High Street,
East Grinstead, RH19 3DE

01342 314 300
[email protected]

Contact us

Simon Duddy - Editor
01342 333 711
[email protected]

Liza Helps - Property Editor
07540 624 360
[email protected]

Louise Carter - Editorial Support
01342 333 735
[email protected]

Neill Wightman - Sales Manager
07818 574 304
[email protected]

Sharon Miller - Production
01342 333 741
[email protected]

Logistics Matters