Hart active at Acton
Hart Door Systems has completed the installation of seven insulated roller shutters at London Underground’s Acton Works maintenance facility in west London.
Hart Door Systems has completed the installation of seven insulated roller shutters at London Underground’s Acton Works maintenance facility in west London.
Hart Doors has completed another contract at the Wimbledon Traincare depot, the traction maintenance depot servicing South Western Railway.
Hart Door Systems, the Newcastle-based specialist engineering company, has won multi-door orders for export to Russia, Hong Kong and Kuwait.
Hart Door Systems (Hart Doors), working through Southern Industrial Roofing, has completed a contract to supply seven insulated shutters and one high-speed Speedor Storm at the Dundee and Angus Energy from Waste facility at Baldovie, north east of Dundee.
Hart Door Systems, the Newcastle upon Tyne-based specialist engineering firm, has won multi-door orders for export to Russia, Hong Kong and Kuwait.
Hart Door Systems has completed the installation of a major contract comprising Speedor Cleanrooms, Speedor Storms and a Firebrand fire shutter for a leading UK manufacturer and supplier of flavourings, extracts and essences.
Hart Door Systems is an engineering company that specialises in the design and manufacture of a wide variety of door systems relevant to the challenges of everyday business.
Hart resolves many issues within the built environment as safety and security issues continue to arise globally. As a result Hart’s products are in daily use in vital, economic, sectors such as aviation, energy from waste, infrastructure, food and beverage production as well as a host of manufacturing processes.
Of Hart’s many brands, it’s the internationally recognised Speedor range of high-speed doors that became so successful in establishing Hart’s outstanding reputation in as many as 35 countries. After all, a typical Speedor has on average a life expectancy of over 20 years and 500,000 operational cycles in normal conditions. This attests to the quality of Hart’s engineering.
With Hart’s bespoke manufacturing skills through its range of Speedor high-speed doors, Hart can offer tailor-made solutions to meet specific individual needs. As a result, Hart helps companies to control temperature, balance air pressure, deter pests, avoid contaminants, odour and noise as well as improving energy consumption.
Hart’s range of environmental, fire and security products are in daily use in key sectors such as airports, pharmaceuticals, defence, energy and the nuclear/electrical power industry, water, transport, food, automotive, pulp and paper, waste to energy, as well as major social projects such as sporting stadia. Hart’s reach is global, its sector experience immeasurable.
Hart has supplied thousands of industrial doors to infrastructure projects both across the UK and internationally across rail, ports, energy and utilities. The contracts indicate an ability to work within the strict disciplines of major, complex contracts.
Hart’s reputation for technical excellence developed over many years has given Hart a distinct edge when involved in major projects such as international airports where Hart has supplied safety, fire protection and security solutions to over 40 airports world-wide including Dubai, London Heathrow, Jeddah, Baghdad, Bergen, London Gatwick, Newcastle International, Aberdeen, Falklands, Vladivostok and Harare.
www.hartdoors.com [email protected] t: +44 ( 0 ) 191 214 0404
Replacing one of its Speedor range of high-speed doors after 21 years of service is, says Hart Door Systems, unusual but to get repeat orders for two doors with the same history of longevity is remarkable.
Working with Vanderlande Industries BV at King Abdulaziz International Airport, Jeddah, Hart Door Systems is currently completing an order for fire and security shutters for the baggage handling system. Hart is also working with Antemina International on a door project at Baghdad International Airport.
Gordon Kipling has joined Hart Door Systems as Service Manager with responsibility for servicing Hart’s and other manufacturers’ doors across the UK.
Hart Doors Systems has supplied a high-speed door, a sectional overhead door and two inflatable dock seals for Steinhoff UK Group Properties at its 420,000ft2 Magna Park, distribution facility in Warrington, for its Harveys and Benson for Beds subsidiary.
Hart Doors Systems has completed a contract to supply a high-speed door, a sectional overhead door and two inflatable dock seals for Steinhoff UK Group Properties at its 420,000 sq ft Magna Park, Warrington, distribution facility for its Harveys and Benson for Beds subsidiary.
The automatic high-speed ‘Speedor Mini’ pictured is one of two such doors supplied and installed in just two weeks by Hart Door Systems at the Barnsley site of Cranswick Foods, one of Yorkshire’s largest cooked meats suppliers.
This Speedor Super was installed by Hart Door Systems at HLC Wood Products’ plant at Upwood Air Park, Peterborough, where the south facing side of the aircraft hangar was sometimes subject to extreme weather due to the exposed position on this former RAF airfield.
Hart Doors Systems’ recently restructured service facility through the appointment of Gordon Kipling as service manager is paying dividends through a significant level of new business.
Hart Door Systems’ recently restructured service facility through the appointment of Gordon Kipling as service manager is paying dividends through a significant level of new business.
Hart Door Systems has installed a Speedor high-speed door system for DHL Nisa Retail at its Scunthorpe logistics facility on the Normanby Enterprise Park.
New from Hart Door Systems is a high security shutter which has been tested to LPS1175 SR4 issue 7 standards by the Loss Prevention Council Board, part of the British Research Establishment.
Working through Building Craftsmen, the Dumfries-based contractor, Hart Door Systems has completed the installation of more Speedor ‘Minis’ at Arla Foods’ production facility at Melton Mowbray.
Working through SSE Contracting Services, Hart Door Systems has completed the installation of 14 high-speed doors at First Great Western’s Laira Depot, Plymouth.