Loading bays boost efficiency at new distribution hub
Hörmann UK installed over 100 loading bays along with a significant number of level access doors and fire exit doors at Panattoni Park Nottingham.
Hörmann UK installed over 100 loading bays along with a significant number of level access doors and fire exit doors at Panattoni Park Nottingham.
BID Group’s client, one of the largest supermarket retailers in the UK, needed 22 warehouse bays upgrading to meet current health and safety standards, handle the volume of traffic and provide smooth operations.
Having the wrong door solution in place could incur higher costs than you think, says Stanair.
Hart Door Systems has completed a major contract for a range of doors and shutters at Nissan Manufacturing UK’s car plant, Sunderland.
As part of a recent expansion, hazardous waste management firm Chloros has installed specialist Thorworld Industries’ loading equipment, within new, state of the art facilities.
Wolfgang Gorner, managing director of Hörmann UK has reacted to COVID-19 and its threat to the health and wellbeing of the nation.
Hörmann UK to keep industrial business going on a reduced scale.
The installation of a three-tonne insulated roller shutter manufactured by Hart Door Systems completed a work package which has seen a total of 40 doors installed over the last year for Taylors of Harrogate, the independent family tea and coffee company.
The installation of a three-tonne insulated roller shutter manufactured by Hart Door Systems completed a work package which has seen a total of 40 doors installed over the last year for Taylors of Harrogate, the independent family tea and coffee company.
With the UK’s weather, rain is never far away and water entering the dock loading area can create a slip hazard. Dock shelters from BID Group provide a solution.
In 74 years of trading, Hart Door Systems has never experienced the challenges presented by the Coronavirus (COVID-19) pandemic, writes Nick Hart, managing director, Hart Door Systems.
One of Panattoni’s latest developments, Derby370, boasts over 370,990 sq. ft of warehousing space, and is located close to the city centre to provide arterial transport routes to the M1, A50, and A38.
Designed to provide unrivalled protection for vehicles, loading bays and buildings, the proven range of PE Dock Bumpers from Stertil Dock Products has been boosted with the introduction of adjustable-height versions.
Working through Vanderlande, Hart Doors has won a contract to supply 60 high-speed screens for a new baggage handling system at Manchester International airport.
Hart Door Systems, the Newcastle-based specialist engineering company, has won multi-door orders for export to Russia, Hong Kong and Kuwait.
As one of the UK’s largest delivery companies, Evri sorts and delivers millions of parcels every day. With ambitions of adding greater capacity to its nationwide network and strengthening its regional operations, the company – formerly known as Hermes – committed to creating a third super hub.
Housing 42,282 sq ft of speculative industrial / warehouse space, Proxima Park, Waterlooville, Unit 320, was recently completed by Magrock Ltd. The development features ASSA ABLOY’s industrial door and dock leveller solutions.
Putting the needs of food and beverage manufacturers in the frame with industry certified industrial door solutions
Logistex has been awarded a contract by the John Lewis Partnership to design and implement a solution to optimise their new e-commerce distribution centre at Fenny Lock, Milton Keynes.
KEEPING UP with regulations can be challenging. An equal challenge is the need to control costs. So, what can cold warehouses do to enhance the integrity of cold chain storage?