Hart active at Acton

Posted on Wednesday 7 October 2020

Hart Door Systems has completed the installation of seven insulated roller shutters at London Underground’s Acton Works maintenance facility in west London.

Kyle Pendergood at Hart Doors says the contract included the installation of a three tonnes shutter which was 11.8m wide and 4.4m high.
 
“Its weight alone was significant as was the width,” says Kyle. “We had a detailed lifting plan to make this work. The Hart team again rose to the challenge.”
 
Hart is familiar with Acton site having installed three of its Speedor Storm doors last autumn. The ‘Storm’ door is a high-speed door capable of withstanding winds up to 90 mph when closed and is designed for frequent use in high traffic situations.
 
www.hartdoors.com t: 0191 214 0404

Published By

Western Business Media,
Dorset House, 64 High Street,
East Grinstead, RH19 3DE

01342 314 300
[email protected]

Contact us

Simon Duddy - Editor
01342 333 711
[email protected]

Liza Helps - Property Editor
07540 624 360
[email protected]

Louise Carter - Editorial Support
01342 333 735
[email protected]

Neill Wightman - Sales Manager
07818 574 304
[email protected]

Sharon Miller - Production
01342 333 741
[email protected]

Logistics Matters