Optimised yard loading in response to high-volume contract

Posted on Thursday 7 August 2025

Speedpac has enhanced its loading operations with the installation of a Hörmann Transdek 12-pallet Vehicle-to-Ground (V2G) yard lift at its Wellingborough facility.

Speedpac has enhanced its loading operations with the installation of a Hörmann Transdek 12-pallet Vehicle-to-Ground (V2G) yard lift at its Wellingborough facility.

THE INVESTMENT by the specialist in third-party logistics and contract packing solutions was made in response to a new high-volume contract requiring the efficient loading and unloading of double-deck trailers and other fleet vehicles directly from the warehouse floor – without the need for traditional dock levellers.

The Hörmann Transdek V2G was fully installed and operational within three days, with minimal disruption to ongoing warehouse operations.

5.3-tonne capacity

With a 5.3-tonne capacity, the lift was delivered on-site as a pre-assembled, fully enclosed pod, with external cladding fitted as standard. Capable of accommodating up to 12 pallets, the 2500mm x 6900mm platform length allows for a full articulated vehicle to be loaded in just a few cycles. The lift is powered by a single hydraulic ram which offers reliable, durable, and low maintenance operation. 

Versatile deployment

The V2G lift was installed within an existing temporary structure at Speedpac’s site, highlighting how the system can be deployed virtually anywhere, even in non-permanent or space-restricted environments. Its modular design also makes it ideal for businesses looking to scale up or adapt their logistics operations quickly in response to changing demand.

Speedpac has enhanced its loading operations with the installation of a Hörmann Transdek 12-pallet Vehicle-to-Ground (V2G) yard lift at its Wellingborough facility.

Speedpac managing director David Brocklehurst, says: “The V2G lift has provided an immediate and cost-effective loading solution, enabling us to operate efficiently ahead of the completion of our new dock installation project – all without the need for expensive and disruptive civil works.

“It’s a robust, highly efficient, and user-friendly system that has already become a vital asset to our operations, supporting a major new contract six days a week.”

“The Hörmann Transdek team delivered the project on time, within budget, and with a high level of professionalism,” he adds. “The V2G lift has significantly enhanced our operational flexibility and capacity, allowing us to handle complex loading demands across a wide range of vehicle types with ease.”

Published By

Western Business Media,
Dorset House, 64 High Street,
East Grinstead, RH19 3DE

01342 314 300
[email protected]

Contact us

Simon Duddy - Editor
01342 333 711
[email protected]

Liza Helps - Property Editor
07540 624 360
[email protected]

Louise Carter - Editorial Support
01342 333 735
[email protected]

Neill Wightman - Sales Manager
07818 574 304
[email protected]

Sharon Miller - Production
01342 333 741
[email protected]

Logistics Matters