Temporary building enables one-site operation
Wiltshire HBM, more commonly known as Wiltshire Concrete, needed to house its expanding fleet and trucks on one main site as the time and diesel wasted on travelling between an existing workshop and the main concrete plant was becoming a problem, temporary building specialist, Aganto was able to supply a solution.
A 15x 30x 4.2m temporary warehouse was decided upon, which came with a thermo roof, sandwich walls and roller shutter doors at the front to accommodate and shelter the ever-expanding and busy fleet.
Wiltshire Concrete MD, Kevin McQuaid, comments: “By choosing an Aganto building, the benefit has been an immediate and significant saving in terms of time and money and having it all on the one site. The whole process was seamless from doing the deal, erection on site to commissioning the building.”
The Aganto temporary building has also provided coverage over underground inspection pits, meaning even more space and the capacity for underground additional workshop potential without even having to move.


