AR Racking builds a 23,010 pallet clad-rack warehouse at -24 deg C
Designed to operate at -24°C, the 4,640 m² facility will accommodate 23,010 Euro pallets in a high-density, automated multi-depth storage system.

AR Racking is building a new clad-rack warehouse for Ultracongelados Azarbe in Santomera (Murcia), expanding frozen storage capacity without interrupting the plant’s operations.
Reaching 35 metres to the underside of the roof trusses and 38 metres overall, the racking structure will also support the building’s roof and wall cladding. Featuring fully galvanised steel profiles, the project combines demanding engineering requirements, efficient space utilisation and reliable performance in freezing conditions.
AR Racking is responsible for the entire process, from engineering and manufacturing to installation.
Read more: https://bit.ly/4z1heAo





